AtlasEdge has introduced the event of LEV002, a brand new information centre in Leverkusen, situated alongside its current LEV001 facility. The venture is meant to extend AtlasEdge’s capability in Germany and assist demand within the Rhineland area.
The LEV002 facility is deliberate to offer 4.4MW of capability and round 3,400 sq. metres of technical house. Building started in February 2026, with completion and readiness for service anticipated within the second quarter of 2027. The growth follows rising utilisation at LEV001, which is approaching full capability, and displays ongoing demand for colocation and high-performance infrastructure within the area.
The event is a part of AtlasEdge’s broader development technique in European markets. The corporate states that it goals to offer infrastructure in places the place prospects require connectivity and efficiency capabilities.
The ability is designed to assist a spread of workloads, together with AI and high-density computing. It’s deliberate to function utilizing renewable vitality and is being developed in step with Germany’s Vitality Effectivity Act (EnEfG). The positioning can be anticipated to focus on business certifications together with EN 50600, ISO 27001, and ISO 9001.
Key particulars for LEV002 embrace:
- 3,400 m² of information centre house
- 4.4 MW capability
- Building begin: February 2026
- Anticipated operational date: Q2 2027
- Deliberate use of 100% renewable vitality
- Design give attention to AI and high-density workloads
- Focused business certifications
