Sunday, 14 Dec 2025
Subscribe
logo
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Font ResizerAa
Data Center NewsData Center News
Search
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Data Center News > Blog > Power & Cooling > Vertiv co-develops with NVIDIA | Data Centre Solutions
Power & Cooling

Vertiv co-develops with NVIDIA | Data Centre Solutions

Last updated: October 21, 2024 1:26 pm
Published October 21, 2024
Share
Vertiv co-develops with NVIDIA | Data Centre Solutions
SHARE

Vertiv is releasing an entire 7MW reference structure of the NVIDIA GB200 NVL72 platform, co-developed with NVIDIA, that can allow clients to remodel conventional information centre architectures into AI factories able to powering AI purposes throughout the enterprise.

The reference structure will speed up the deployment of the NVIDIA GB200 NVL72 liquid-cooled rack-scale platform and helps as much as 132kW per rack. The structure takes an end-to-end method to infrastructure design to optimise deployment velocity, efficiency, resiliency, value, vitality effectivity and scalability for current- and future-generation information centres.

“We’re proud to deepen our collaboration with NVIDIA to allow AI-driven information centres of right this moment and tomorrow,” mentioned Giordano (Gio) Albertazzi, CEO of Vertiv. “As a pacesetter in important energy and cooling infrastructure, Vertiv is uniquely positioned to assist the NVIDIA GB200 NVL72 platform. Our portfolio of high-performance energy and cooling options, mixed with our international scale, will allow clients to deploy AI information centres quicker, extra effectively and with better flexibility to deal with densification, dynamic workloads, retrofits and allow future-ready designs.”

“New information centres are constructed for accelerated computing and generative AI with architectures which can be considerably extra complicated than these for general-purpose computing,” mentioned Jensen Huang, founder and CEO of NVIDIA. “With Vertiv’s world-class cooling and energy applied sciences, NVIDIA can realise our imaginative and prescient to reinvent computing and construct a brand new {industry} of AI factories that produce digital intelligence to learn each firm and {industry}.”

With Vertiv™ energy and cooling infrastructure matched to, and intently coupled with, the NVIDIA Blackwell platform, the reference structure simplifies and accelerates deployment of AI workloads in new and present information centres whereas lowering threat and enabling standardisation throughout websites. The structure’s full important energy infrastructure is designed to considerably cut back stranded energy by aligning AI clusters to information centre capability blocks. The hybrid liquid- and air-cooling infrastructure leverages the interdependent impression of the 2 approaches to effectively handle high-density warmth elimination. As well as, the design contains steerage for optionally available Open Compute Undertaking-inspired programs, akin to DC energy cabinets.

See also  Flexera aims to remove barriers between ITAM and FinOps data

The reference structure is a part of the Vertiv™ 360AI portfolio of reference designs for retrofit and greenfield information centres, designed to assist clients navigate built-in options for energy and cooling for AI and different high-performance computing purposes. Key advantages of the co-developed reference structure for the NVIDIA GB200 NVL72 design embody:

● Speedy Deployment and Retrofit: Enabling the usage of preconfigured modules and manufacturing unit integration, VertivTM MegaModTM CoolChip delivers turnkey AI important infrastructure as much as 50% quicker than onsite builds.

● House-Saving Energy Administration: Utilizing Vertiv’s superior energy applied sciences, together with Vertiv™ Trinergy™ uninterruptible energy provide system (UPS) and Vertiv™ EnergyCore lithium battery cupboard, the design delivers industry-leading reliability and energy-efficient energy administration in ~40% much less area in comparison with legacy choices.

● Vitality-Environment friendly Cooling: Integrating liquid and low-GWP (World Warming Potential) air cooling applied sciences at scale – together with Vertiv™ AFC chiller, Vertiv™ Liebert® CW chilled water-based room cooling system and Vertiv™ XDU coolant distribution models – presents as much as 20% decrease annual cooling prices in comparison with fastened screw options.

● Dynamic Workload Administration: Built-in load averaging by way of lithium-ion battery and subsequent era UPS supplies assist for dynamic GPU workloads.

● Set up and Operations Companies: With an industry-leading scale, scope, and attain of ~4,000 subject service engineers globally, Vertiv is the trusted lifecycle service companion and complicated system-level skilled for retrofit and newbuild.

As enterprises embrace AI at an unprecedented tempo, Vertiv is reshaping the way forward for important energy and cooling to assist accelerated computing, with probably the most full portfolio of important digital infrastructure that permits AI-ready infrastructure able to managing the distinctive necessities of AI and different accelerated compute purposes.

See also  Paul Hood appointed COO of AVK to lead expansion in innovative power solutions

Source link

TAGGED: centre, codevelops, data, Nvidia, Solutions, Vertiv
Share This Article
Twitter Email Copy Link Print
Previous Article Blackcore Launches ACE Overclocked Servers Powered by AMD CPUs Blackcore Launches ACE Overclocked Servers Powered by AMD CPUs
Next Article Nvidia-Backed Firm Eyes Data Center Near Japan’s Nuclear Power Nvidia-Backed Firm Eyes Data Center Near Japan’s Nuclear Power
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
YoutubeSubscribe
LinkedInFollow
MediumFollow
- Advertisement -
Ad image

Popular Posts

Which vendors are driving network strategy? The answer might surprise you

One resolution to this, clearly, is to merge with one of many large compute gamers,…

May 17, 2025

atNorth appoints Janne Sigurdsson as Chief Sustainability and Compliance Officer

atNorth has appointed Janne Sigurdsson as Chief Sustainability and Compliance Officer. With an intensive background…

June 7, 2025

Jupiter Endovascular Raises $21M in Funding

Jupiter Endovascular, Inc., a Menlo Park, CA-based medical know-how startup, exited stealth mode with a…

August 18, 2024

EU finalises General-Purpose AI Code of Practice

In a significant milestone for synthetic intelligence governance, the European Fee has obtained the ultimate…

July 12, 2025

95% of Organizations Updated Cybersecurity Strategies in the Past Year

Because the digital panorama continues to evolve at an unprecedented velocity, organizations are racing to…

May 2, 2024

You Might Also Like

shutterstock 2291065933 space satellite in orbit above the Earth white clouds and blue sea below
Global Market

Aetherflux joins the race to launch orbital data centers by 2027

By saad
Why data centre megadeals must prove their value
Global Market

Why data centre megadeals must prove their value

By saad
atNorth's Iceland data centre epitomises circular economy
Cloud Computing

atNorth’s Iceland data centre epitomises circular economy

By saad
How to build true resilience into a data centre network
Global Market

How to build true resilience into a data centre network

By saad
Data Center News
Facebook Twitter Youtube Instagram Linkedin

About US

Data Center News: Stay informed on the pulse of data centers. Latest updates, tech trends, and industry insights—all in one place. Elevate your data infrastructure knowledge.

Top Categories
  • Global Market
  • Infrastructure
  • Innovations
  • Investments
Usefull Links
  • Home
  • Contact
  • Privacy Policy
  • Terms & Conditions

© 2024 – datacenternews.tech – All rights reserved

Welcome Back!

Sign in to your account

Lost your password?
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.
You can revoke your consent any time using the Revoke consent button.