Monday, 12 Jan 2026
Subscribe
logo
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Font ResizerAa
Data Center NewsData Center News
Search
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Data Center News > Blog > Infrastructure > Schneider Electric increases production capacity
Infrastructure

Schneider Electric increases production capacity

Last updated: November 14, 2024 8:41 am
Published November 14, 2024
Share
Schneider Electric increases production capacity
SHARE

Schneider Electrical has considerably scaled the manufacturing and manufacturing capability of its Barcelona prefabricated information centre manufacturing unit – growing it from 7000m2 to 12,000m2 in response to accelerated buyer demand for prefabricated, high-compute workload information centre options.

Headquartered in Sant Boi de Llobregat, Barcelona, the manufacturing unit and large-scale logistics centre, which is among the major European areas for the design, manufacturing, and integration of Schneider Electrical’s EcoStruxure Modular Information Centre portfolio, now supplies an extra 5000m2 of devoted, manufacturing house – assembly accelerated buyer necessities for pace to market, predictability, and resilient, information centre options.

Pushed by buyer calls for for high-compute workloads and synthetic intelligence (AI), which based on PWC World, might contribute as much as $15.7 trillion to the worldwide financial system in 2030, the Sant Boi Facility is now the biggest manufacturing web site for Schneider Electrical’s prefabricated modular information centres in Europe. Analyst Omdia expects world gross sales of prefabricated modular information centre techniques to generate $8.6bn in 2027.

Additional, the funding has enabled the corporate to double the end-to-end manufacturing, integration, testing and output capabilities for each its all-in-one modular information centres and prefabricated energy modules. This consists of key powertrain parts equivalent to three-phase uninterruptible energy provides (UPS), low (LV) and medium-voltage (MV) tools, circuit breakers and switchgear.

“Prefabricated modular information centres are one of the vital environment friendly and sustainable methods to design and deploy excessive efficiency information centre capability at pace and scale, whereas making certain much less wastage, optimised manufacturing and a discount within the embedded carbon inside the house,” mentioned Marc Garner, SVP, Safe Energy & Information Centre Enterprise, Schneider Electrical, Europe. “By scaling up our end-to-end manufacturing capability in Barcelona, we’re reinforcing our provide chain capabilities at a time of unprecedented development, and making certain clients in Europe have entry to quick, predictable, and high-quality information centre options, which might be designed and operational in as little as 24-weeks.”

See also  Waterland Private Equity partners with Black & White Engineering

A resilient world provide chain, constructed for AI and accelerated computing

Not too long ago, Schneider Electrical introduced a $3 billion (€2.76B) multi-year settlement with Compass Datacenters, certainly one of Inc. Journal’s 5000 quickest rising corporations, to combine each organisations’ respective provide chains, and manufacture prefabricated modular information centre options shortly and cost-effectively, at-scale.

In direct response to the burgeoning demand for AI, this distinctive 5-year settlement has enabled Schneider Electrical and Compass Datacenters to ship extremely scalable, modular information centres that

provide a simplified design, streamlined manufacturing, and the power to be deployed simply throughout a mess of distant environments.

Schneider Electrical’s funding in its Sant Boi manufacturing unit mirrors this technique fully and can present European clients with the power to scale-up their information cener operations in Tier 1 and Tier 2 information centre markets, and speed up deployment instances by utilising best-in-class manufacturing and testing capabilities.

Moreover, the Sant Boi manufacturing unit supplies a extremely optimised manufacturing atmosphere that permits organisations’ to build-out standardised or customisable, high-compute workload information centre clusters, the place options might be prefabricated energy modules or mix energy, cooling, and IT infrastructure into one superior, and ready-to-ship resolution.

Source link

TAGGED: capacity, Electric, increases, production, Schneider
Share This Article
Twitter Email Copy Link Print
Previous Article Ericsson targets enterprise connectivity with streamlined 5G solutions Ericsson targets enterprise connectivity with streamlined 5G solutions
Next Article servers.com opens six new data centre locations servers.com opens six new data centre locations
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
YoutubeSubscribe
LinkedInFollow
MediumFollow
- Advertisement -
Ad image

Popular Posts

Valar Labs Raises $22M in Series A Funding

Valar Labs, a Palo Alto, CA-based developer of computational histology AI (CHAI) exams for predicting…

June 2, 2024

Momentic Raises $3.7M in Seed Funding

Momentic, a San Francisco, CA-based supplier of an AI-powered software program testing platform, raised $3.7M…

March 8, 2025

VMware Revives Free ESXi Hypervisor with vSphere 8.0U3e Update

VMware has quietly reinstated its free hypervisor providing, making the ESXi 8.0U3e model obtainable as soon as…

April 14, 2025

On-Prem vs. Private Cloud: What’s the Difference?

For those who work within the tech business, you in all probability know that on-prem…

May 31, 2024

Enterprises are rethinking AI infrastructure as inference costs rise

AI spending in Asia Pacific continues to rise, but many corporations nonetheless battle to get…

November 24, 2025

You Might Also Like

AWS logo on wall
Global Market

AWS hikes prices for EC2 Capacity Blocks amid soaring GPU demand

By saad
LiquidStack secures CDU capacity order to meet AI demand
Infrastructure

LiquidStack secures CDU capacity order to meet AI demand

By saad
Schneider Electric announces new VP amidst AI-driven growth
Power & Cooling

Schneider Electric announces new VP amidst AI-driven growth

By saad
Schneider Electric appoints Matthew Baynes VP of data centre division
Colocation

Schneider Electric appoints Matthew Baynes VP of data centre division

By saad
Data Center News
Facebook Twitter Youtube Instagram Linkedin

About US

Data Center News: Stay informed on the pulse of data centers. Latest updates, tech trends, and industry insights—all in one place. Elevate your data infrastructure knowledge.

Top Categories
  • Global Market
  • Infrastructure
  • Innovations
  • Investments
Usefull Links
  • Home
  • Contact
  • Privacy Policy
  • Terms & Conditions

© 2024 – datacenternews.tech – All rights reserved

Welcome Back!

Sign in to your account

Lost your password?
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.
You can revoke your consent any time using the Revoke consent button.