Sunday, 12 Apr 2026
Subscribe
logo
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Font ResizerAa
Data Center NewsData Center News
Search
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Data Center News > Blog > Infrastructure > Poland’s Atman opens flagship data centre – Shaping the future of data processing in Central Europe
Infrastructure

Poland’s Atman opens flagship data centre – Shaping the future of data processing in Central Europe

Last updated: September 24, 2025 7:38 pm
Published September 24, 2025
Share
Poland’s Atman opens flagship data centre – Shaping the future of data processing in Central Europe
SHARE

Atman, Poland’s main information centre operator, has launched WAW-3 – the area’s most superior and sustainable information centre campus, designed to deal with the explosive progress of AI workloads and cloud providers in Europe. With 14.4 MW IT energy and cutting-edge liquid cooling expertise, WAW-3 units a brand new benchmark for scalable, high-performance infrastructure, establishing Poland as a rising digital chief in Central and Japanese Europe.

Situated simply exterior Warsaw on a 5.5-hectare website, the WAW-3 campus combines strategic logistical benefits with state-of-the-art technological options in energy provide, cooling, and telecommunications. Designed to satisfy the wants of extremely demanding enterprise prospects and public establishments, WAW-3 presents availability, scalability, and reliability in accordance with worldwide requirements for high quality and safety. The primary facility on the campus gives 6,324 m² of knowledge corridor area and 14.4 MW of IT energy capability. Developed according to prime sustainability ideas, it achieves class-leading power effectivity and makes use of technical water in a closed-loop system. That is solely the start. The subsequent levels of improvement – the development of second and third buildings – will enable for versatile scaling in response to growing demand. All the infrastructure is future-proof by design and able to deal with the challenges of digital transformation and the fast-growing information economic system.

“This funding elevates us to a brand new stage as a knowledge centre providers supplier – not solely in Poland, however throughout the whole CEE area – as evidenced by the belief of the monetary establishments backing our venture. It marks one other step in our growth inside the area’s most business-dense space, additional strengthening Warsaw’s place as a key information hub and reinforcing Atman’s popularity as a world-class accomplice supporting the strategic progress of its prospects,” emphasises Slawomir Koszolko, Atman’s CEO.

See also  UK Data Center Event Addresses Industry’s Biggest Challenges | DCN

A European Knowledge Market on the Rise

As of 2025, Europe’s information centre sector is experiencing speedy progress. Operational capability throughout the EMEA area has elevated by over 20% year-on-year, reaching 10.3 GW, with an additional 2.6 GW beneath building and 11.5 GW in planning. On the identical time, the Polish market is present process a big transformation. Complete IT energy capability within the nation’s information centres is anticipated to greater than triple, exceeding 500 MW by 2030. As a result of restricted energy availability in mature FLAP-D markets, investor consideration is shifting towards rising second-wave markets, corresponding to Warsaw.

On this context, the WAW-3 campus was designed to satisfy the evolving infrastructure wants of the European market. It helps digital transformation at scale and gives future-ready, high-performance colocation providers. It’s the first facility of its variety in Poland by way of architectural sophistication, capability, and utilized applied sciences.

“The surge in demand for digital providers, coupled with the rising depth of AI-driven workloads, requires a strong, extremely scalable infrastructure with important computing capability. The WAW-3 campus is our reply to this problem – and our benefit. By staying forward of market traits, we grew to become the primary in Poland to ship a venture of this scale and technological development,” provides Slawomir Koszolko.

Strategic Infrastructure for a Digital Europe

The event of the information centre is pushed by Atman’s mission to supply dependable, steady entry to information – reflecting the “non-stop-data” philosophy. With this funding, the corporate is introducing high-density colocation with closed-loop liquid cooling to the Warsaw market – an answer able to host and construct AI Factories with the strictest necessities. Consequently, WAW-3 can successfully assist the event of IT environments for world enterprises and hyperscale suppliers.

See also  Sustainable data centre lighting for the future

The WAW-3 campus will ultimately comprise three buildings, providing a complete colocation area of practically 19,000 m², 43 MW of IT energy capability, and lodging for greater than 50,000 servers. The long run amenities will match the usual of the primary constructing, that includes devoted safety zones and a totally developed logistics infrastructure, together with loading docks, storage amenities, and parking areas, to supply prospects with end-to-end operational help. Continuity of service is maintained by devoted groups accountable for infrastructure safety and technical assist. The timeline for subsequent improvement phases will align intently with the tempo of business curiosity, enabling the venture to adapt flexibly to market calls for.

Sustainable Development Backed by Sturdy Financing

The corporate’s strong monetary standing has been recognised by establishments each in Poland and overseas. As a mark of this belief, Atman secured a mortgage of PLN 1.35 billion (EUR 293.5 million) from a consortium of six monetary establishments. Importantly, the mortgage settlement goes past typical monetary circumstances to incorporate  bold commitments to power effectivity and sustainable improvement, in accordance with ESG ideas. This serves as affirmation that Atman just isn’t solely rising dynamically, but in addition steadfastly implementing a accountable progress technique which includes the continual, complete optimisation of power and water utilization.

Source link

TAGGED: Atman, Central, centre, data, Europe, Flagship, Future, opens, Polands, processing, Shaping
Share This Article
Twitter Email Copy Link Print
Previous Article Hitachi to Pour $1B into Grid for Data Center Expansion Hitachi to Pour $1B into Grid for Data Center Expansion
Next Article Adoption comes at high security cost Adoption comes at high security cost
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
YoutubeSubscribe
LinkedInFollow
MediumFollow
- Advertisement -
Ad image

Popular Posts

AI Ready Data Centers by VIRTUS – Advanced Cooling Solutions

Virtus Knowledge Centres, a number one UK-based knowledge middle operator, is on the forefront of…

December 2, 2024

OpenAI announces new board lineup and governance structure

OpenAI has announced a refreshed board of administrators and new governance construction following current turmoil…

March 11, 2024

Embracing Neurodiversity in IT Workplace to Bridge Talent Gaps

Nearly half of young adults with autism have by no means had paid employment, but…

September 2, 2024

Scientists created the first programmable, logical quantum processor

The primary challenge for practical quantum computing is error suppression, necessitating quantum error correction for…

January 22, 2024

Nvidia says 20K AI startups are building on its platform

Be a part of us in returning to NYC on June fifth to collaborate with…

May 26, 2024

You Might Also Like

Why sovereignty now shapes data centre planning in Europe
Global Market

Why sovereignty now shapes data centre planning in Europe

By saad
GCRE to develop renewable energy and data centre in South Wales
Infrastructure

GCRE to develop renewable energy and data centre in South Wales

By saad
ControlMonkey expands cloud configuration disaster recovery for improved resilience
Infrastructure

ControlMonkey expands cloud configuration disaster recovery for improved resilience

By saad
NTT DATA reveals next-gen Keihanna OSK11 data centre in Kyoto
Power & Cooling

NTT DATA reveals next-gen Keihanna OSK11 data centre in Kyoto

By saad
Data Center News
Facebook Twitter Youtube Instagram Linkedin

About US

Data Center News: Stay informed on the pulse of data centers. Latest updates, tech trends, and industry insights—all in one place. Elevate your data infrastructure knowledge.

Top Categories
  • Global Market
  • Infrastructure
  • Innovations
  • Investments
Usefull Links
  • Home
  • Contact
  • Privacy Policy
  • Terms & Conditions

© 2024 – datacenternews.tech – All rights reserved

Welcome Back!

Sign in to your account

Lost your password?
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.
You can revoke your consent any time using the Revoke consent button.