Saturday, 7 Mar 2026
Subscribe
logo
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Font ResizerAa
Data Center NewsData Center News
Search
  • Global
  • AI
  • Cloud Computing
  • Edge Computing
  • Security
  • Investment
  • Sustainability
  • More
    • Colocation
    • Quantum Computing
    • Regulation & Policy
    • Infrastructure
    • Power & Cooling
    • Design
    • Innovations
    • Blog
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Data Center News > Blog > Colocation > Nebius to triple capacity at Finland data centre to 75 MW
Colocation

Nebius to triple capacity at Finland data centre to 75 MW

Last updated: October 8, 2024 8:23 pm
Published October 8, 2024
Share
Nebius to triple capacity at Finland data centre to 75 MW
SHARE

The enlargement of the Finnish information middle – a state-of-the-art location with robust inexperienced credentials – is a part of Nebius’ program to speculate greater than USD 1 billion in AI infrastructure in Europe by mid-2025. This system additionally consists of investments in build-to-suit information facilities at greenfield websites primarily in Europe in addition to co-locations, such because the lately introduced GPU cluster in Paris.

Andrey Korolenko, Head of Infrastructure at Nebius, mentioned: “Tripling capability at our flagship web site in Finland is a vital step in our build-out of best-in-class AI infrastructure in Europe. Our information middle at Mäntsälä is our ‘dwelling base’ and showcases our ambition and the technical capabilities of the Nebius staff, in addition to our strategy to adopting sustainability ideas in our infrastructure. The capability we’re including right here throughout this enlargement section will allow us to higher serve rising demand from AI builders globally.”

Nebius is already one of many main suppliers of GPU capability in Europe by means of the Mäntsälä information middle. The enlargement in Finland will embody deployment of NVIDIA H200 Tensor Core GPUs, which can be out there to prospects from November, along with already put in NVIDIA H100 Tensor Core GPUs that type the spine of Nebius’ fleet of NVIDIA GPUs. Nebius may even be one of many first suppliers in Europe to deliver the state-of-the-art, energy-efficient NVIDIA Blackwell platform to prospects in 2025.

The information middle at Mäntsälä deploys modern technological options that assist to cut back its environmental footprint, reflecting Nebius’ strategy to adopting sustainability ideas in its infrastructure. These embody {hardware} optimized for intensive workloads, energy-efficient supercomputing, superior cooling and warmth restoration programs.

See also  These Batteries Could Harness the Wind and Sun To Replace Coal and Gas

With an influence utilization effectiveness (PUE) as little as 1.1 beneath excessive IT hundreds, the info middle considerably outperforms the worldwide common of 1.58. It additionally makes use of free cooling, decreasing reliance on chillers and refrigerants, and incorporates a warmth restoration system to repurpose server warmth for native residential heating. This method at the moment recovers roughly 20,000 MWh of power yearly, heating the equal of two,500 Finnish properties. Enlargement of the info middle will additional enhance the effectivity of the warmth restoration program.

The Mäntsälä information middle can also be dwelling to ISEG, among the many strongest supercomputers worldwide in each efficiency and power effectivity. With 35.26 GFlops per watt-second, it ranks within the prime 25 supercomputers by power effectivity globally. The ability’s modern design permits for operations at greater server temperatures, as much as 40°C, contributing further power financial savings of roughly 15%.

Nebius is being purpose-built to satisfy the calls for of the worldwide AI trade and leans on deep technical experience throughout {hardware}, software program and machine studying. The corporate’s 500+ robust staff of engineers has a long time of information of constructing world-class tech infrastructure, in addition to an in-house LLM R&D staff.

The present funding program will allow Nebius to succeed in a complete capability of tens of 1000’s of NVIDIA GPUs to deliver its extremely differentiated, energy-efficient, full AI cloud providing to prospects worldwide.

Source link

TAGGED: capacity, centre, data, Finland, Nebius, Triple
Share This Article
Twitter Email Copy Link Print
Previous Article IT Pros Weigh Salary, Flexibility, and Mental Health as Burnout Looms IT Pros Weigh Salary, Flexibility, and Mental Health as Burnout Looms
Next Article Cables submarinos Red Sea cable cuts disrupted up to 70% of traffic, says RETN
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
TwitterFollow
InstagramFollow
YoutubeSubscribe
LinkedInFollow
MediumFollow
- Advertisement -
Ad image

Popular Posts

Kyndryl launches latest security edge offerings in collaboration with Cisco

Kyndryl, a technology infrastructure services provider, has recently unveiled two security edge services developed in…

February 3, 2024

Microsoft launches passkey support for all consumer accounts

Passkeys can exchange conventional passwords together with your system’s personal authentication strategies. That approach, you'll…

May 3, 2024

DeepGreenX and Veea forge $140B alliance to build AI-powered virtual energy grid

DeepGreenX and hyper-converged multi-access community supplier Veea have fashioned a world strategic partnership to implement…

November 26, 2024

Using Renewable Energy to Power Data Centers Sustainably | DCN

Data centers consume 1-2% of the world’s electricity, and demands are growing. As more industries…

January 28, 2024

EU invests €865 million to expand 5G and edge computing by 2027

The EU Commission announced it's investing 865 million euros ($935M USD) in digital infrastructure to…

October 31, 2024

You Might Also Like

URL HTTP Web Address
Global Market

AI transforms ‘dangling DNS’ into automated data exfiltration pipeline

By saad
Elevate showcases infrastructure developments at Data Centre World London 2026
Design

Elevate showcases infrastructure developments at Data Centre World London 2026

By saad
Can data centres scale AI without putting water under pressure?
Global Market

Can data centres scale AI without putting water under pressure?

By saad
Steel joints. Mounting bolted connection of steel beams before welding. Metal construction covered protective gray primer. Close-up.
Global Market

Data center new builds diminish even as demand rises

By saad
Data Center News
Facebook Twitter Youtube Instagram Linkedin

About US

Data Center News: Stay informed on the pulse of data centers. Latest updates, tech trends, and industry insights—all in one place. Elevate your data infrastructure knowledge.

Top Categories
  • Global Market
  • Infrastructure
  • Innovations
  • Investments
Usefull Links
  • Home
  • Contact
  • Privacy Policy
  • Terms & Conditions

© 2024 – datacenternews.tech – All rights reserved

Welcome Back!

Sign in to your account

Lost your password?
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.
You can revoke your consent any time using the Revoke consent button.