A flagship in sustainable infrastructure
The FRA-Mainz campus (a 50/50 three way partnership between Inexperienced Mountain, an Azrieli Group firm, and KMW) units a brand new commonplace for environmental efficiency:
The location shall be powered by 100% renewable power from KMW’s wind and photo voltaic portfolio.
Fuel-turbine emergency energy replaces conventional diesel backup.
Environment friendly cooling shall be supplied by the close by Rhine River as a cooling supply.
Surplus warmth from the ability will feed Mainz’s district-heating community by way of heat-pump know-how, serving as much as 20 000 households, the Mainz Cathedral, and Mewa Area.
Collectively, these measures will guarantee minimal CO₂ emissions and a powerful dedication to environmental accountability.
“This anchor settlement demonstrates the belief world market leaders place in our supply mannequin and our dedication to actually sustainable, large-scale information middle infrastructure,” stated Svein Atle Hagaseth, EVP & Chief Enterprise Officer, Inexperienced Mountain World.
Capability shall be handed over in levels throughout roughly 3.5 years.
